The “Cost” translates into the overhead cost to the firm that project generated based on staff cost rate. The “Fee” is the suggested billable amount based on staff billing rates.
0
0
Knowledge Base > Projects > FAQs > On the “Projects” tab, what is the difference between “Cost” and “Fee”?
0
0